Virginia Tech® home

Hitt Hall and New Dining Facility

Rendering of exterior of Hitt Hall on the right and a photo of current construction progress on the left

ABOUT THE PROJECT

On Aug. 30, the Virginia Tech Board of Visitors reviewed the design, and approved funding for, a new cutting-edge facility in the North Academic District of the Blacksburg campus. Hitt Hall will provide an expanded physical presence for the Myers-Lawson School of Construction - a joint collaboration between the College of Architecture and Urban Studies and the College of Engineering - as well as add critical dining and academic spaces.

Detailed in the university’s master plan, Hitt Hall will be located near West Campus Drive on a site amongst the existing New Classroom Building, Derring Hall, and Bishop-Favrao Hall. The project will support the master plan’s vision by installing a critical section of the Infinite Loop at the site, which is part of a two-mile fully accessible pathway that will link all campus districts.

The approximately 100,000-gross-square-foot multipurpose facility will provide Myers-Lawson School of Construction with innovation and discovery spaces in the building’s east wing.

Hitt Hall will feature a 600-seat full-service multivenue dining facility on two floors the building’s west wing, flexible general assignment classrooms on the third floor, and open collaboration zones throughout. The dining capacity added by Hitt Hall, with its nine distinct dining venues, will increase and more evenly distribute dining services for students, faculty, and staff on the Blacksburg campus.

The building’s unique two-story Innovation Lab will provide program opportunities for temporary and large-scale student-based projects. And the surrounding exterior Innovation Plaza will provide additional space for outdoor demonstrations, teaching, and dining.

Hitt Hall’s classrooms, collaboration spaces, and restrooms will be ADA-compliant, to be consistent with all new construction at Virginia Tech.

Hitt Hall will be built in a collegiate gothic expression and a palette of materials consistent with Campus Design Principles and buildings on the Blacksburg campus, including signature Hokie Stone. Two outdoor terraces are integrated seamlessly into the architecture.

Philanthropy

Philanthropy plays a crucial role in Hitt Hall’s realization. The building is named in recognition of a multimillion dollar gift from the Hitt Family Foundation Inc. The Hitt family’s company, Hitt Contracting Inc., is one of the nation’s largest general contractors and has employed Virginia Tech graduates for years.

“I’m excited to see this building coming together,” said HITT Contracting Co-Chairman Brett Hitt, a member of the company’s founding family. “Our company prioritizes technology and talent. Whether it’s integrating robots into construction sites, maximizing the safety and efficiency of buildings, or attracting a broader and more diverse talent pool to the industry, we strive to be on the leading edge. Virginia Tech is doing that, too, through its powerful research and teaching, which is why it was natural for us to support this project.”

Sustainability features

Hitt Hall will be constructed to obtain or exceed LEED Silver Certification. Environmentally friendly building components include energy-efficient HVAC systems and windows, water-efficient plumbing, refillable water bottle stations, and building materials secured through sustainable procurement practices.

Timeline

Construction start: Spring 2022

Target completion: Summer 2024

Build Method

CM at risk

Gross Square Feet

101,000

Current Phase

Under construction

SOCIAL MEDIA

PROJECT VISUALS

Renderings

Rendering of the interior of Hitt Hall featuring multistory dining venues.
Rendering of the interior of Hitt Hall featuring multistory dining venues.
Rendering of Hitt Hall featuring two terraces with a view to the east.
Rendering of the exterior of Hitt Hall (view to the east).
Exterior rendering of Hitt Hall from a south view
Rendering of the exterior of Hitt Hall (view to the south).
Hitt Hall exterior rendering
Rendering of the exterior of Hitt Hall (view to the north).

Progress Photos

February 2022

An excavator digging at the Hitt Hall construction site.
February 2022

January 2023

Hitt Hall under construction in the steel framing stage.
January 2023

July 2023

A distant view of Hitt Hall under construction. The building has exterior walls but no windows, and no Hokie Stone has been installed yet.
July 2023

April 2022

Earthwork being done at the Hitt Hall construction site.
April 2022

January 2023

A view looking out from inside Hitt Hall that is under construction. There are steel beams and floors framed out.
January 2023
A view from inside Hitt Hall while under construction. The exterior walls have been constructed but there is not Hokie Stone on them yet.
August 2023

September 2022

Hitt Hall under construction on a bright, clear day. There is a truck in the foreground and a crane as well. The building has barely begun to come out of the ground.
September 2022

March 2023

Hitt Hall under construction with steel framing and a large crane lifting the final steel beam into place during the topping out ceremony.
March 2023

October 2023

A view of Hitt Hall under construction. There are several cranes along the outside walls of the structure. There is Hokie Stone about halfway up the exterior.
October 2023

November 2022

Hitt Hall under construction, viewed from Derring Hall. There is an initial steel frame structure and a crane in the background.
November 2022

June 2023

The inside of Hitt Hall while under construction. There is purple drywall, exposed metal framed walls, and empty wooden crates.
June 2023

November 2023

Hitt Hall under construction. There are sunrays streaming through the windows and scaffolding scattered around in the large, half-finished room.
November 2023