Photo of McBryde 100 Classroom

After its renovation in the summer of 2015, McBryde 100 is once again the embodiment of current thought on large auditorium style learning spaces. This project improved accessibility, technology, seating, and acoustical performance in one of the most heavily utilized classrooms on campus. A major component of the renovation was changing the slope of the floor to significantly improve accessibility and mobility for students and faculty. The project also installed new seats with integrated electrical outlets and created a new, cleaner presentation surface at the front of the room. Wood veneer ceiling and wall panels were installed to improve the acoustic qualities of the room.  In an attempt to forestall water intrusion, Hokie Stone walls were repaired and the roof membrane was replaced before the interior renovation work began.

Building Number
151

Gross Square Footage
5,900 GSF (renovated)

Virginia Tech Project Manager
Aaron Curfiss

Construction Manager
MB Contractors, Inc.

A/E
Westlake Reed Leskosky

Project Budget
$2,800,000

Construction Status
Complete

Project Completion
August 2015

LEED Certification
N/A

For additional information, contact Aaron Curfiss at 540-449-9148.

Concept Images and Renderings

Before Construction Photos

Construction Photos

Contact

Mailing address
Facilities Department (0529)
Sterrett Facilities Complex
Virginia Tech
230 Sterrett Drive
Blacksburg, VA 24061

Phone
540-231-4300